This was a ground remediation project to remove hazardous soils from site to a specialist tip where in some areas excavations were down to a depth of 2.5m.
The project required the transport and removal of up to 40 loads a day of material off site.
In tandem with the muck away operations we were required to import suitable material in order to re-establish the site back to the correct level. Utilising our in house substantial vehicle fleet, we were able to minimise vehicle movements to site.
Throughout the process, Amiante STR maintained a watching brief, to further enhance best working practices and to allow the statutory compliance to be of the highest possible standards.
A further element to the project throughout the excavation process entailed the breakup and crushing of concrete obstructions found. This material was re used on site further minimising vehicle movements
- Excavation and safe disposal of contaminated soils
- Import of suitable fill
- Exposing concrete obstructions
- Crushing concrete material and provide a working platform for future works
“We write to thank Collards for the efforts...to make it run smoothly to bring it to a successful conclusion. Throughout the project we have received positive feedback from stakeholders on how the project has been professionally managed and the minimal impact the works have had...considerable achievement taking into account the number of lorry movements.”
Key Details
Services
Remediation ServicesLocation
Fairway, Greenford
Client
Segro
Contract Value
£128,250.00
Duration
18 weeks
Key Challenges
- • Working on a highly contaminated site
- • Hazardous waste removal
- • Live campus location with complex site constraints