Fairway, Greenford

This was a ground remediation project to remove hazardous soils from site to a specialist tip where in some areas excavations were down to a depth of 2.5m.

The project required the transport and removal of up to 40 loads a day of material off site.

In tandem with the muck away operations we were required to import suitable material in order to re-establish the site back to the correct level. Utilising our in house substantial vehicle fleet, we were able to minimise vehicle movements to site.

Throughout the process, Amiante STR maintained a watching brief, to further enhance best  working practices and to allow the statutory compliance to be of the highest possible standards.

A further element to the project throughout the excavation process entailed the breakup and crushing of concrete obstructions found. This material was re used on site further minimising vehicle movements

  • Excavation and safe disposal of contaminated soils
  • Import of suitable fill
  • Exposing concrete obstructions
  • Crushing concrete material and provide a working platform for future works

Key Details

Location

Fairway, Greenford

Client

Segro

Contract Value

£128,250.00

Duration

18 weeks

Key Challenges

  • • Working on a highly contaminated site
  • • Hazardous waste removal
  • • Live campus location with complex site constraints